Design and Build of Hospital in Tenbek Area at Al Khor

Location: Tenbek Area in between Al Khor and Simaisma

Client: Al Ali Engineering Co. W.L.L

Start Date: June 2019

Completion Date: August 2022

Project Description

The project constructed a hospital in the Tenbek Area near Al-Bayt Stadium and the constructed all ancillary buildings (the emergency building, the ambulance building, a mosque, and electrical rooms, in addition to the infrastructure networks) storm water, sewer, potable water and fire water pipelines).

Description of Actual Services / Performed

STS employed team consisting of General Manger, Site Supervisor, Senior Surveyor, Surveyors and Draftsmen were responsible for the entire surveying work in the project, whether stakeout points or measure as built, which are briefly as follows:

  • Established 16 control points in the project and measure it
  • Studied engineering drawings for the project
  • Extracted the coordinates from the engineering drawings and handed them over to the surveyors by the draftsmen
  • Al Ali Site Engineer distributed the jobs to the surveyors such as stakeout the points of the structural elements (footing, columns, ceilings, walls, etc.) and stakeout of pipeline points in the site
  • Measured the as built survey for building and pipelines.
  • Prepared the GIS files and delivered to client.