STS Survey Technologies

Home > Projects 

Design and Build of Hamad Airport Amiri Terminal Extension

Location: Hamad Airport Amiri Terminal

Client: Al Ali Engineering Co. W.L.L

Start Date: May 2021

Completion Date: September 2022

Project Description

The project is adding a building to the Amiri Terminal in Hamad Airport and infrastructural work (sewerage and storm water pipe lines and manholes)

Description of Actual Services / Performed

STS performed complete surveying works starting from control points until project handover including but not limited undertake to perform daily activities, daily monitoring, processed data and reports related to complete survey activities. The surveying works complete back to back basis with AAE requirements and approval of the Consultant, Employer and relevant authorities, in details. STS undertake to performed the service such as:
 

  • Established10 control points in the project and measure it
  • Studied engineering drawings for the project and extracted the coordinates from the engineering drawings and handed them over to the surveyors by the the draftsmen
  • The Site supervisor distributed the jobs to the surveyors for stakeout the points of the structural elements (footing, columns, ceilings, walls, etc.) And stakeout of pipeline points in the site